Almost every business fixes things in the wrong order, and for an understandable reason.
Growth is urgent and visible. Fixing a process is neither. So the order becomes grow first, repair later, and the repair happens during the months when everybody is busiest and least able to think.
That is the most expensive way to do it.
How to tell what has to be ready first
A process needs fixing before you grow if it has two properties.
It gets harder faster than the business grows. Following up, knowing where things are, collection, checking quality. These do not scale in a straight line.
And it is hard to fix while busy. Anything that needs people to change how they work needs their attention, and attention is the first thing growth takes away.
Something that is linear and quick to change can safely wait. Something that is non linear and needs attention cannot.
The conversation worth having
Ask your team one question. If we won twice the work next quarter, what would you be most worried about?
They answer honestly, and they answer differently from you. The owner usually worries about capacity to produce. The office usually worries about the paperwork, the follow ups and the chasing, because they know what forty orders already feels like.
Their answer is usually the right one, because they are closer to the part that breaks.
Fix one thing on that list before the growth, not after. Businesses that do this grow without the six months of chaos everybody treats as unavoidable.
Ask your office what would worry them most if the work doubled. Then fix that, before it does.
Deciding what has to be ready before growth, rather than repairing during it, is the conversation we would rather have early. Tell us what your office is worried about.
Comments
Nothing here yet. Be the first to say something.